BRISBANE CITY COUNCIL COMPLAINTS

BRISBANE CITY COUNCIL COMPLAINTSBRISBANE CITY COUNCIL COMPLAINTSBRISBANE CITY COUNCIL COMPLAINTS

BRISBANE CITY COUNCIL COMPLAINTS

BRISBANE CITY COUNCIL COMPLAINTSBRISBANE CITY COUNCIL COMPLAINTSBRISBANE CITY COUNCIL COMPLAINTS
  • Home
  • Court documents
  • Roger Greenway
  • Andrew Blake
  • Lucy Ting
  • Sara McCabe
  • Margaret Orr
  • Scott Ruhland
  • Joel Wake
  • Zarndra Piper
  • Sara McCabe contempt
  • The other easement
  • Engineering case 1003
  • Contact
  • Council email con
  • More
    • Home
    • Court documents
    • Roger Greenway
    • Andrew Blake
    • Lucy Ting
    • Sara McCabe
    • Margaret Orr
    • Scott Ruhland
    • Joel Wake
    • Zarndra Piper
    • Sara McCabe contempt
    • The other easement
    • Engineering case 1003
    • Contact
    • Council email con
  • Home
  • Court documents
  • Roger Greenway
  • Andrew Blake
  • Lucy Ting
  • Sara McCabe
  • Margaret Orr
  • Scott Ruhland
  • Joel Wake
  • Zarndra Piper
  • Sara McCabe contempt
  • The other easement
  • Engineering case 1003
  • Contact
  • Council email con

Roger Greenway causes the next Brisbane flood with pen

Roger Greenway, unlicenced engineer, never heard about the Rational Method. It takes 60 seconds.

got to rational method calculation

Roger Greenway causes flood damage and possible loss of life. He couldn't do a 60 second calculation

Roger Greenway of Brisbane City Council had 2 choices

Option 1. Flood Darra with 5.4 million litres a day, every year,*

* Roger Greenway design based on Q1 Brisbane flood of 63 l/s, roof 2700sqm, coefficient .87m  5 minutes, BCC annual rainfall 1 year, Rational method QUDM, Total 5,443,200 litres per 24 hours

Option 2. Save lives. Get on the calculator for 5 minutes.

Roger Greenway chose option 1.

Roger Greenway, Brisbane City Council employee, engineered and designed an illegal Brisbane flood system at 128 Ashridge Rd Darra. The engineered design of Roger Greenway unlicenced engineer, will flood Darra and cause possible loss of life. Roger Greenway knows that he has untentionally caused  flooding nuisance of  5,4 million litres of water flow every day in Q 1 Brisbane flood, each and every year.

GO TO PUBLIC COURT DOCUMENTS

Roger Greenway Christmas present to Darra residents - 5.4 million litres of water a day, every year.

go to court documents

Roger Greenway, unlicenced engineer, drew this illegal Brisbane flood plan with his mum's biro.

Roger Greenway Brisbane City Council employee drew an illegal flooded  urban stormwater plan to Lot 98, 99,100 as part his assessment of 128 Ashridge Rd Darra subdivision. 


David Manteit never asked him to draw this plan. In 412 subdivision cases approved last year, this is the only stormwater plan last year that anyone from Brisbane City Council engineered and designed a stormwater plan.


The only one. Roger Greenway plan. The only plan in 412 approved cases that someone from Brisbane City Council engineered a sroemwater plan.


The is a plan of 61 metres of pipe of the newest Brisbane flood, which will cause 90 swimming pools a day into Darra resident's yards, cause damage and possible loss of life.




GO TO COURT DOCUMENTS 2916/24

Roger Greenway plan will force flow of 171 l/s in a Q20 to the kerb which only handles 30l/s.

Based on ceoeffient of .87, Annual rainfall 5 minute 20 years,

GO TO PUBLIC COURT DOCUMENTS

RTI reveals the Roger Greeway illegal Brisbane flood plan above

Roger Greenway never read the flood manual - prevent flood

Greenway prefers (to this day) not to recognise loss of life (social) and flooding of Darra houses.

To contravene Roger Greenway illegal flooded plan - $734k fi

As of 2/4/25 Roger Greenway still hasn't woken up - he still wants possible loss of life.

 

email roger greenway for flood enquiries

Roger Greenway 6/11/24 - "I still don't own a calculator"

Roger Greenway was the assessment manager for the S81 minor change application. He had his chance to do a 60 second calculation to avoid possible loss of life. He chose the next Brisbane flood and possible loss of life. He has tried to hide is mistakes from the Planning Court and the world.

Roger Greenway - "build my plan or pay $734,724 fine.

Copyright © 2025 Brisbane City Council Complaints - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept